-The current record for completing a painted drawing, from the undecorated version to a final GIF version, was 1:55 LLPX GP38-2 #2256, done in 16 minutes from start to finish on January 07, 2006.
200th 1:55 EMD drawing: SD38,
SD40 with dynamic brakes, front/back view May 03, 2002
300th 1:55 EMD
drawing: GP38-2,
Phase 2a (MP
2138-2157) August 03, 2003
400th 1:55 EMD
drawing: SD70I,
CN version top view April 06, 2004
500th 1:55 EMD
drawing: F69PH-AC
right-side view September 11, 2004
600th 1:55 EMD
drawing: SD50,
CR version right-side view March 14, 2005
700th 1:55 EMD
drawing: SD9,
Phase 1 (GN 573-578) July 11, 2005
800th 1:55 EMD drawing: SD40-2,
Phase 1a (SOO 757-784) September 30, 2005
900th 1:55 EMD drawing: GP38-2,
Phase 2c (SCL 6053-6065) December 04, 2005
1000th 1:55 EMD drawing: SD45X
(SP 9500-9502, EMDX 4201-4203) February 24, 2006
1300th 1:55 EMD drawing: SD60M,
Phase 1c (BN 9200-9249) December 11, 2006
1400th 1:55 EMD drawing: SD45,
Phase 1a2 (SP 8800-8844) January 12, 2007
1500th 1:55 EMD drawing: GP9RM
(some of CN 4125-4143, 7014-7083) July 28, 2007
100th 1:55 GE drawing: ES44AC
(UP 5695-5699) May 18, 2004
200th 1:55 GE drawing: C39-8,
GSC trucks (some of NS 8564-8613) February 04, 2006
300th 1:55 GE drawing: C30-7,
Phase 1 (UP 2400-2429) March 22, 2006
400th 1:55 GE drawing: U28B,
Phase 2 (GN 2524-2529) October 27, 2006
100th 1:55 ALCO drawing: BBD HR616 right-side view September 29, 2004
100th 1:55 painted drawing: CN
SD40-2W #5334 (Expo 86) March 28, 2002
200th 1:55 painted drawing: ATSF
GP60M #146 (Maersk) December 10, 2002
300th 1:55 painted drawing: Rocky
Mountaineer GP40-2W #8012, October 19, 2003
400th 1:55 painted drawing: MEC
GP38 #261 (orange & green), January 10, 2006
100th 1:55 rolling stock drawing: Bethlehem
Steel 89' 4" low-level flatcar, early Thrall autorack, November
15, 2004
200th 1:55 rolling stock drawing: ACF
4650 cu-ft hopper (Phase 2b, 30" hatches, gravity-pneumatic outlets),
May 02, 2007
300th 1:55 rolling stock drawing: CN
Transcona 49' well car, 5-unit drawbar-connected, December 21,
2007
1000th 1:55 drawing: MLW
CP H-1e class (Royal Hudson) Started on March 10, 2004; completed on
March 31, 2004
1500th 1:55 drawing: TWI
73' high-capacity Centerbeam flatcar, depressed center, January
02, 2005
2000th 1:55 drawing: GE-Westinghouse
GG1, prototype (PRR 4800) Started on December 12, 2005; completed
on December 17, 2005
3000th 1:55 drawing: TGV
V150 world record train set Started on June 01, 2007; completed on
June 28, 2007
First 1:55 drawing: early October 2000, a Phase
2 EMD GP40 with dynamic brakes.
First 1:55 freight car: late 2002, an ACF
50' boxcar.
First 1:55 locomotive right-side view: July 23, 2003, a Phase
1 EMD GP40-2 with dynamic brakes.
First 1:55 steam locomotive: March 31, 2004, the 1000th drawing above.
First 1:55 container: May 01, 2004, a 40'
x 8.5' partially corrugated container
First 1:55 European electric locomotive: January 09, 2005, an SNCF
BB 22200.
First 1:55 European diesel locomotive: January 10, 2005, an SNCF
BB 67400.
First 1:55 trailer: March 16, 2005, a 53'
Wabash aluminum plate trailer.
First 1:36 drawing: February 23, 2008, an EMD
RM-1.
.
- 1:36 Yearly Progress -
| 2008 | 2009 | Total | |
| 1:36 EMD/GMD Locomotives | 300 | 36 | 336 |
| 1:36 GE Locomotives | 44 | 80 | 124 |
| 1:36 ALCO/MLW/BBD Locomotives | 6 | 6 | |
| 1:36 Rolling Stock | 2 | 2 | |
| 1:36 Painted Locomotives | 15 | 1 | 16 |
| 1:36 Lineside Structures and Equipment | 4 | 4 | |
| 1:36 Road Vehicles | 2 | 2 | |
| Yearly Total | 373 | 117 | 490 |
| 2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | Total | |
| 1:28 EMD Locomotives | 14 | 8 | 1 | 23 | ||||||
| 1:28 Painted Locomotives | 1 | 1 | ||||||||
| 1:55 EMD Locomotives | 32
(43) |
106 | 74 | 147
(165) |
178 | 372 | 451 | 205 | 4 | 1567 |
| 1:55 GE Locomotives | 21 | 36 | 26 | 38 | 50 | 255 | 2 | 22 | 450 | |
| 1:55 ALCO/MLW/BBD Locomotives | 5 | 43 | 21 | 49 | 11 | 2 | 44 | 175 | ||
| 1:55 FM/CLC Locomotives | 21 | 19 | 12 | 52 | ||||||
| 1:55 BLW Locomotives | 2 | 2 | ||||||||
| 1:55 MK/MPI Locomotives | 3 | 2 | 5 | |||||||
| 1:55 RPRX Locomotives | 1 | 2 | 3 | |||||||
| 1:55 Rolling Stock | 3 | 37 | 90 | 10 | 35 | 148 | 1 | 324 | ||
| 1:55 Containers/Trailers | 15 | 1 | 4 | 20 | ||||||
| 1:55 Electric Locomotives | 1 | 1 | ||||||||
| 1:55 6-driver Steam Locomotives | 3 | 3 | ||||||||
| 1:55 8-driver Steam Locomotives | 2 | 2 | ||||||||
| 1:55 Painted Locomotives | 17 | 35 | 161 | 95 | 67 | 22 | 40 | 16 | 8 | 461 |
| 1:55 Painted Rolling Stock | 1 | 19 | 50 | 10 | 2 | 12 | 94 | |||
| 1:55 Painted Containers/Trailers | 40 | 20 | 60 | |||||||
| 1:55 SNCF Trains | 8 | 23 | 1 | 32 | ||||||
| 1:55 Painted SNCF Trains | 1 | 1 | 4 | 6 | ||||||
| 1:55 Road Vehicles | 8 | 8 | ||||||||
| 1:14 Locomotive Air Horns | 3 | 3 | ||||||||
| Yearly Total | 63
(74) |
175 | 328 | 349
(367) |
553 | 539 | 800 | 408 | 79 | 3292 |
- Total Yearly Progress -
| 2000-07 | 2008 | 2009 | Total | |
| 1:36 Series | 373 | 117 | 490 | |
| 1:55, 1:28 and 1:14 Series | 3213 | 79 | 3292 | |
| Total | 3213 | 452 | 117 | 3782 |
- Yearly Goals -
2004:
The 1000th drawing overall was completed on March 31.
The goal of 350 was met on October 25.
A total of 400 was reached on November 28.
A total of 500 was reached on December 15.
Final total was 553.
2005:
The goal of 400 was met on October 01.
A total of 500 was reached on December 07.
The 2000th drawing overall was completed on December 17.
Final total was 531.
2006:
A combined total of 1000 (new and revised) was reached on December
14.
The goal of 800 was met on December 31.
Final total was 800.
2007:
The goal was 500, lowered to 400 in November.
Final total was 408.
2008:
The goal was 400 (raised to 500 in April, reverted to 400 in October).
The goal of 400 was met on December 16.
Final total was 452.
2009:
The goal is 400.
At the current rate, 350 drawings will be completed in 2009.
120m