Undecorated Drawings - EMD GP15T
Selected scales: |
1:18 Drawings
Model | Built | Phase | Numbers | Notes | Last modified |
---|---|---|---|---|---|
EMD GP15T ← → | 1982-10 - 1982-12 | CO 1500-1524 | 2022-02-08Revision history:
2019-08-06 - Relocated front hood seam resulting in revised hood proportions - Front section of hood lengthened and blower duct widened by 1" - Middle hood doors narrowed by 0.25" - Increased height of walkway blower duct and bottom of hood doors - Corrected seam at bottom corners of long hood - Corrected minor line glitch on latches on first engine room door 2020-12-09 - Revised side handrail stanchions - Increased handrail thickness - Dynamic brake fan - Fuel tank vent pipe (increased diameter, revised fittings) - Increased metal sand pipe diameter - Air pipe vent valve (left front / right rear under walkway) 2021-01-09 - Fuel tank height and gap from underframe 2022-02-08 - Coupler cut lever and pilot details - Corner handrail end plate / stairwell attachment points - Revised ribs on blower duct |
See also: