Top header photo
 Trainiax logo
HomeNewContactLinks

Undecorated Drawings - GE BQ23-7

Selected scales:


1:18 Drawings

Model Built Phase Numbers Notes Last modified
GE BQ23-7
  
1978-11 -
1979-02
1d SCL 5130-5139
2023-02-18Revision history:

2018-01-15
- Minor correction to sand line above right rear truck

2018-11-21
- Revised air reservoir height and brackets
- Changed air reservoir brackets to early style with vertical C-channel supports
- Relocated rear traction motor cables closer to fuel tank
- Added end-mounted fuel gauge on fuel tank

2019-07-22
- Removed panel above front steps

2020-11-18
- Revised horn

2021-01-05
- Increased corner handrail thickness

2021-02-11
- Pipe behind rear truck
- Added sloped plate under frame behind draft gear
- Fuel filler
- Added safety valve to front air reservoir (left side)
- Small pipe clips above fuel tank (right side)
- Added underframe box / conduit behind top step (left side)

2022-08-02
- Coupler cut lever and pilot details
- Corner handrail and step bolts
- Horn manifold and back cap dimensions

2023-02-18
- Bottom taper on stairwell side sheet

See also: