Top header photo
 Trainiax logo
HomeNewContactLinks

Painted Drawings - CSXT

Selected scales:


The year under "Paint, date" indicates the date of the reference photo(s) used for the drawing.

1:18 Locomotives

Number Model Paint, date Notes Last modified
CSXT #1524
 
EMD GP15T YN3
2007
2022-02-08Revision history:

2020-02-01
- Relocated front hood seam resulting in revised hood proportions
- Front section of hood lengthened and blower duct widened by 1"
- Middle hood doors narrowed by 0.25"
- Increased height of walkway blower duct and bottom of hood doors
- Corrected seam at bottom corners of long hood
- Corrected minor line glitch on latches on first engine room door

2020-12-09
- Revised side handrail stanchions
- Increased handrail thickness
- Dynamic brake fan
- Fuel tank vent pipe (increased diameter, revised fittings)
- Increased metal sand pipe diameter
- Air pipe vent valve (left front under walkway)

2021-01-11
- Fuel tank height and gap from underframe

2022-02-08
- Coupler cut lever and pilot details
- Corner handrail end plate / stairwell attachment points
- Revised ribs on blower duct
CSXT #1896
 
GE U18B YN2
1991
2022-12-17Revision history:

2021-01-05
- Increased corner handrail thickness

2021-02-09
- Added sloped plate under frame behind draft gear
- Air filter bracket and piping behind fuel tank
- Added sloped plate under frame behind draft gear

2021-02-13
- Longer handrail stanchion in front of cab (right side)

2022-02-08
- Coupler cut lever and pilot details
- Corner handrail and step bolts

2022-12-17
- Changed number font to Neue Haas Grotesk Medium

See also: